Schools Projects
New Middle School & Theatre for High School
Location: Bainbridge, GA
Type of Facility: Middle/High School
Description: VRF Heat Pumps, DOAS Units, Split Heat Pumps, Kitchen Hoods, Exhaust Fans & Unit Heaters
Completion Date: September 2024
Spring Park Elementary School
Location: Green Cove Springs, FL
Type of Facility: Elementary School
Description: Chilled Water/Electric Heat
Completion Date: July 2023
Renaissance Center Renovations
Location: Thomasville, GA
Type of Facility: Charter School
Description: Interior Exterior Renovations Including HVAC, Finishes, Flooring, Roofing, Cannopy System, Masonry, Concrete,Electrical, Plumbing
Completion Date: June 2022
New Beach Elementary School
Location: Panama City Beach, FL
Type of Facility: School
Description: New Construction-Chilled Water,Heating Hot Water, HVAC Controls,Ductwork, Piping, Insulation
Completion Date: TBD
PK Yonge Expansion Phase 2
Location: Gainesville, FL
Type of Facility: School
Description: New Construction-Chilled Water,Electric Heat, HVAC Controls, Ductwork, Piping,Insulation. (3) Energy LabsCustom AHUs
Completion Date: March 2021
New Lowndes High School Phase 2
Location: Valdosta, GA
Type of Facility: K-12 Educational
Description: New 3-story246,791SF High School building forLowndes County High Schoolwith BIM Modeling andCoordination: (2) 250-ton Carrier air cooled chillers located on the roof; Mechanical plant on the first floorconsisting of (2) 500gpm Primary and (2) 500gpm Secondary Pumps and associated hydronics specialties all byArmstrong; (12)CarrierAHU’s totaling 158,000cfm of supply air serving (169)NailorVAV Terminal Units withelectric heat; (6) Valent DOAS units totaling 46,825cfm of OA; (11)Pennbarryfans and (4) Penthouse Ventilators;(6) Electric Heaters; (19) Carrier Ductless units serving stairs and IDF rooms; (3) Carrier VRF units with a total of(30) Indoor units serving the Admin area on the 1stfloor;(4) CaptiveAire Commercial Kitchen Hoods with F.S.systems and (4) KEF’s and (3) KSF’s;(9) Residential Ranges Hoods with factory-mounted F.S. systems; (1)JET/Monoxivent dust collection system; Complete sheet metal duct air distribution system.
Completion Date: August 2021
New Liberty County High School
Location: Bristol, FL
Type of Facility: New High School
Description: 32 SplitHP Systems, 9 outside air units, 8 ductless heat pumps, 2 dehumidification units, 28 fans, 8 electricunit heaters, 6 range hoods, duct system
Completion Date: June 2020
Marianna K-8 School
Type of Facility: School
Description: New Construction-Chilled Water, Electric Heat, HVAC Controls, Ductwork, Piping,Insulation
Completion Date: August 2020
Tift High Renovations
Location: Tifton, GA
Type of Facility: High School
Description: Installation of New Central EnergyPlant, WSHP’s, Rooftop, Equipment, Ductwork, Piping, Insulation, Controls
Completion Date: August 2018
Clay Co. Elementary
Location: Green Cove Springs, FL
Type of Facility: New School
Description: Air CooledCondensing Chiller 200 tons /each, Modular Air Handlers, VAV Boxes with ElectricHeat, Chiller Water Pipe, Pumps, Ductwork, Insulation, DDC Controls, Test & Balance
Completion Date: August 2018
Worth County High School
Location: Sylvester, GA
Type of Facility: New High School
Description: (6) RTU’s, (3) Custom, (1) 2-Story Built-UpApparatus Casing with D.X. coils and fan array, (50) Fans, (128) VAV’s,(5) CU’s, (4) P.G.E.’s, (2) P.A.C.’s, (1) OAU, (8) WMHP’s, (17) DSSAC’s, (4) MZDHP’s with Multiple AH’s
Completion Date: August 2018
Hamilton County Elementary School
Location: Jasper, FL
Type of Facility: Elementary School
Description: DX System–Equipment, Piping, Ductwork, Controls, Insulation, O.A. Units
Completion Date: June 2017
Cross Creek Elementary HVAC & Lighting Modifications
Location: Thomasville, GA
Type of Facility: School
Description: HVAC / Lighting / Ceilings / Paint / Flooring /Kitchen Equipment
Completion Date: July 2016
Dixie County Middle High School
Location: Cross City, FL
Type of Facility: New High/Middle School
Description: New High / Middle School including Geo Wells, Condenser Loop, Water Source Heat Pump System, Piping,Ductwork, and associated equipment
Completion Date: November 2017
Madison High School
Location: Madison, FL
Type of Facility: School
Description: Complete Renovation including Chilled & Hot WaterUnderground and Above Grade Piping,Ductwork andassociated equipment.
Completion Date: August 2016